<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>PV Cloud Blog</title><description>Practical pressure vessel engineering from a practising plant engineer: WRC 537 and WRC 297 nozzle local loads, ASME VIII and AS 1210, with the clause numbers shown.</description><link>https://pv-cloud.com/blog/</link><language>en-au</language><item><title>WRC 537 and WRC 297 worked example: a nozzle local load check to AS 1210, step by step</title><link>https://pv-cloud.com/blog/2026-11-06-wrc-537-297-worked-example-as1210/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2026-11-06-wrc-537-297-worked-example-as1210/</guid><description>A full worked example of a nozzle external-load check: WRC 537 on the shell, WRC 297 on the nozzle neck, the pressure stress intensification factor, and the AS 1210 N3.5 stress limits, with every number and every clause.</description><pubDate>Sat, 14 Nov 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>wrc-537</category><category>wrc-297</category><category>as-1210</category><category>worked-example</category></item><item><title>WRC 368 and the pressure SIF: putting internal pressure back into a WRC 297 nozzle check</title><link>https://pv-cloud.com/blog/2026-10-04-wrc-368-pressure-sif/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2026-10-04-wrc-368-pressure-sif/</guid><description>WRC 537 and WRC 297 leave internal pressure out. What AS 1210 N3.5 makes you add back, what WRC 368&apos;s equations give, a worked example, and why the sign of the pressure term matters.</description><pubDate>Sat, 14 Nov 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>wrc-368</category><category>wrc-537</category><category>wrc-297</category><category>as-1210</category><category>worked-example</category></item><item><title>Python and spreadsheet calcs from the reviewer&apos;s side of the desk</title><link>https://pv-cloud.com/blog/2026-10-04-reviewing-coded-calcs/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2026-10-04-reviewing-coded-calcs/</guid><description>What a checker needs from a coded pressure-vessel calculation before signing it: code-order output, validation against published worked examples, version and units, and honest refusals.</description><pubDate>Sat, 14 Nov 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>calculation-review</category><category>verification</category></item><item><title>Pressure vessel shells: the thickness equations, where the stress goes, and worked numbers</title><link>https://pv-cloud.com/blog/2026-10-04-pressure-vessel-shell-thickness/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2026-10-04-pressure-vessel-shell-thickness/</guid><description>Hoop and longitudinal stress from two free bodies, the ASME VIII Div 1 and Div 2 cylinder equations as printed, and one 1500 mm shell sized both ways with every number shown.</description><pubDate>Sat, 14 Nov 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>asme-viii-1</category><category>asme-viii-2</category><category>shell-design</category><category>worked-example</category></item><item><title>Nozzle external loads under ASME VIII: what the code actually requires</title><link>https://pv-cloud.com/blog/2026-10-04-asme-viii-nozzle-loads/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2026-10-04-asme-viii-nozzle-loads/</guid><description>Where ASME VIII Div 1 and Div 2 require piping loads on a nozzle to be checked, which methods they name, how Table 5.6 classifies the stresses, and what a reviewer wants in a Div 1 WRC calc.</description><pubDate>Sat, 14 Nov 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>asme-viii-1</category><category>asme-viii-2</category><category>wrc-537</category><category>wrc-297</category></item><item><title>ASME VIII-2 eq. 4.15.16: why the elliptical head term carries Rmh/hm</title><link>https://pv-cloud.com/blog/2026-10-04-asme-viii-2-elliptical-head-rmh-hm/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2026-10-04-asme-viii-2-elliptical-head-rmh-hm/</guid><description>Why the elliptical head stress in VIII-2 4.15.3.4 has an extra Rmh/hm factor, why the head&apos;s mean radius is the right input, and how that differs from ASME&apos;s 0.9D equivalent radius.</description><pubDate>Sat, 14 Nov 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>asme-viii-2</category><category>elliptical-head</category></item><item><title>AS 1210 Appendix N: what it actually says about nozzle local loads</title><link>https://pv-cloud.com/blog/2026-10-04-as1210-appendix-n-nozzle-loads/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2026-10-04-as1210-appendix-n-nozzle-loads/</guid><description>A clause-by-clause read of AS 1210-2010 Appendix N, N3: the PD 5500 route, the WRC 107 restriction for pierced shells, the mandatory PSIF, the N3.5 stress limits, and where WRC 537 fits.</description><pubDate>Sat, 14 Nov 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>as-1210</category><category>wrc-297</category><category>wrc-537</category></item><item><title>Reinforcement pads under external nozzle loads: what WRC 537 assumes, what FEA shows</title><link>https://pv-cloud.com/blog/2026-08-24-reinforcement-pads-wrc-537/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2026-08-24-reinforcement-pads-wrc-537/</guid><description>The standard two-location check for a padded nozzle under piping loads: combined thickness at the nozzle, bare shell at the pad edge, the WRC 297 width rule, and where the method sits against finite-element results.</description><pubDate>Sat, 14 Nov 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>wrc-537</category><category>wrc-297</category><category>reinforcing-pad</category></item><item><title>Pressure Equipment Workshop 2026: talk resources</title><link>https://pv-cloud.com/blog/pew26/</link><guid isPermaLink="true">https://pv-cloud.com/blog/pew26/</guid><description>Everything from the WRC 537/297 nozzle local loads talk at PEW 2026, Rotorua: the full decision tree, the worked examples, the calculator, and the photo credits.</description><pubDate>Fri, 04 Sep 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>wrc-537</category><category>wrc-297</category><category>decision-tree</category></item><item><title>Which nozzle method, when: the full WRC decision tree</title><link>https://pv-cloud.com/blog/2026-08-26-wrc-nozzle-method-decision-tree/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2026-08-26-wrc-nozzle-method-decision-tree/</guid><description>The decision tree from my Pressure Equipment Workshop 2026 talk, expanded: how the design codes route you, when WRC 537 and 297 apply (and when you run both), every gate that matters, and the honest exits to PD 5500, EN 13445, GOST, and FEA.</description><pubDate>Fri, 04 Sep 2026 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>wrc-537</category><category>wrc-297</category><category>decision-tree</category><category>fea</category></item><item><title>Are you still doing pressure vessel calcs by hand? Here’s what it’s costing you.</title><link>https://pv-cloud.com/blog/2025-09-10-are-you-still-using-excel/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2025-09-10-are-you-still-using-excel/</guid><description>Manual and Excel-based vessel calcs leak time and certainty. A standardised tool makes the method easier to apply and the result easier to audit. It does not replace RPEQ sign-off.</description><pubDate>Wed, 10 Sep 2025 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>calculation-review</category></item><item><title>WRC 537 vs WRC 297: finally making sense of nozzle stress calculations</title><link>https://pv-cloud.com/blog/2025-09-02-wrc-107-537-297-nozzle-design/</link><guid isPermaLink="true">https://pv-cloud.com/blog/2025-09-02-wrc-107-537-297-nozzle-design/</guid><description>WRC 537 is WRC 107 reissued with corrected data and curve fits, not a new method. What each bulletin covers, where WRC 297 fits, and the limits that matter.</description><pubDate>Tue, 02 Sep 2025 00:00:00 GMT</pubDate><category>pressure-vessel</category><category>wrc-537</category><category>wrc-297</category></item></channel></rss>